Jose Guillermo

"I've helped +150 factories calculate this number. I'm here to support you — let's normalize having a loss. It's only an opportunity for improvement."

Jose Guillermo
Manufacturing Tech · 15+ years helping factories get better
Free Tool · Downtime Cost Calculator

What is your downtime really costing you?

Enter a few numbers about one machine or production line and get your monthly downtime cost in under 2 minutes — then receive a personalized analysis by email.

🔒 Your inputs are private — nothing is stored or shared until you choose to submit your email.

15+
Years in manufacturing tech
150+
Factories supported
5K+
Machines connected
Step 1 of 4
Step 1 of 4 · Machine / Line

Which machine or line are you analyzing?

Name the specific asset — this keeps your result and analysis targeted to one line, not averaged across the plant.

Please fill in both fields to continue.
Step 2 of 4 · Working Schedule

What is the working schedule for this line?

This sets the total available production hours per month — the baseline for calculating downtime impact.

Please select one option in each column.
Step 3 of 4 · Availability

What is the average uptime of this machine or line?

Uptime = % of scheduled hours the machine is actually running. Not sure? Use your best estimate — even a rough number gives useful results.

Please select or enter your uptime percentage.
Step 4 of 4 · Production Value

How do you want to value the production on this line?

Choose the approach that best fits what you know. You can always estimate — a directional number is more useful than no number.

I know my product value
Enter the production rate (units/hr) and value per unit — I'll calculate the hourly cost.
I know my hourly cost
Enter the direct cost per hour — burn rate, margin loss, or cost per hour of downtime.
Help me calculate it
Answer 3 quick questions about your team and industry — I'll estimate the hourly cost using labor as a base.
Please select one of the options above.
Step 4 of 4 · Product Value

Production rate and unit value

For — enter figures for normal operating conditions.

Please fill in both fields.
Step 4 of 4 · Hourly Cost

What is the hourly production cost for this line?

For — this is the value lost per hour when the line is down.

Please enter a valid hourly cost.
Step 4 of 4 · Guided Calculation

Tell me about the team running this machine

For — I'll use labor as an anchor and apply an industry multiplier to approximate materials, energy, and variable overhead.

This is an estimate. We use your labor cost as a base and multiply it by an industry factor that accounts for typical materials and variable costs in your sector. Fixed costs are not included.

Operators on this machine per shift

Please fill in all fields to continue.
Your Result

Here's your downtime cost

Calculated for producing .

Monthly downtime cost
$0
in lost production value per month
Downtime hours / month
Capacity lost
Estimated annual impact
Scheduled hours / month
📬

Your analysis is on its way.

Check your inbox — your personalized downtime analysis for will arrive within a few minutes.

← Back to joseaguillermo.com